Causes and Treatment Analysis of Secondary Open Circuit of Current TransformerTime of issue : 2019- 08-28The test terminal in the AC current loop, due to structural and quality defects, causes poor contact between the screw and the copper plate screw hole during operation, resulting in an open circuit.
-
What are the problems with the daily use of current transformers?Time of issue : 2019- 08-28Current transformers are generally marked with a reduced polarity. If the polarity is not connected correctly, it will affect the metering. Even when multiple currents in the same line are connected in parallel, all of them will cause a short circuit accident.
-
What are the wiring methods of current transformers?Time of issue : 2019- 08-28The current transformer is connected by two-phase V-shaped wiring and two-phase current difference wiring using two current transformers; three-phase Y-connection, three-phase delta connection and zero-sequence wiring using three current transformers.
-
Talking about the Causes of the Relay Protection of Power System and Its ProtectionTime of issue : 2019- 08-28Relay protection is the most important secondary system of the power system. It plays an extremely important role in the safe and stable operation of the power system. With the continuous investment of microcomputer relay protection in recent years, the previous inspection standards have gradually adapted to the development of the system.
-
High-voltage DC circuit breakers provide protection for multi-terminal flexible DC transmissionTime of issue : 2019- 08-28On November 18th, at Zhoushan Converter Station of Zhoushan Soft-tolerance Project, after high-strength installation of engineers and technicians of Zhejiang Zhoushan Power Supply Company for half a month, the world's first set of high-voltage DC circuit breakers for engineering use was successfully installed.
-
Current transformer wiring principle and precautions for useTime of issue : 2019- 08-28Electrical debugging is an important part of electric power work. In electrical commissioning work, secondary circuit inspection is an important debugging content.
-
The HVDC transmission technology of China Southern Power Grid has led the world!Time of issue : 2019- 08-28What you don't know is that China Southern Power Grid has built the world's first multi-terminal flexible DC transmission from breaking the monopoly of foreign technology, building China's first independent DC transmission project, and mastering the world's highest level of DC transmission technology.
-
Causes and Treatment Analysis of Secondary Open Circuit of Current TransformerTime of issue : 2019- 08-28The test terminal in the AC current loop, due to structural and quality defects, causes poor contact between the screw and the copper plate screw hole during operation, resulting in an open circuit.
-
What are the problems with the daily use of current transformers?Time of issue : 2019- 08-28Current transformers are generally marked with a reduced polarity. If the polarity is not connected correctly, it will affect the metering. Even when multiple currents in the same line are connected i
-
What are the wiring methods of current transformers?Time of issue : 2019- 08-28The current transformer is connected by two-phase V-shaped wiring and two-phase current difference wiring using two current transformers; three-phase Y-connection, three-phase delta connection and zer
Rugao Yingrui High Voltage Electrical Equipment Co., Ltd.
If you have any suggestions or need for our products, please contact us!
CONTACT
Address:
No. 289, Fushou West Road, Rucheng Town, Rugao, Jiangsu
E-mail: